Which wind jobs are in demand.
Right now: real counts from the job ads on windspellers.com. Coming next: a monthly outlook by a working wind technician, built from the wind news.
// HALF 1 Right now — from the job board
136 job ads in this period · at least 121 positions in the 22 ads that state a number · urgent: 26%
- Mechanical47
- Electrical (LV)40
- Supervision / site lead35
- High voltage (HV)27
- HSE12
- Other11
- Lifting / rigging10
- Blade3
- Hydraulic1
Not stated: 1%
- Installation39
- Service & maintenance35
- Commissioning13
- Inspection5
- Statutory inspection2
- Repowering / dismantling1
Not stated: 30%
- Vestas20
- Siemens Gamesa9
- Enercon6
- GE Vernova6
- Nordex1
Not stated: 69%
- United Kingdom42
- Europe (not specified)20
- Germany18
- Poland13
- Taiwan7
- Denmark4
- Romania4
- Sweden4
- Other30
Not stated: 11%
- Offshore70
- Onshore53
Not stated: 10%
- GWO BST39
- GWO (module not stated)25
- Offshore medical20
- Chester Step test17
- GWO BTT10
- Medical (unspecified)10
- GWO Enhanced First Aid8
- GWO Slinger Signaller8
- HV / electrical authorisation7
- Vestas training7
Not stated: 30%
136 job ads in this period · at least 121 positions in the 22 ads that state a number · urgent: 26%
- Mechanical47
- Electrical (LV)40
- Supervision / site lead35
- High voltage (HV)27
- HSE12
- Other11
- Lifting / rigging10
- Blade3
- Hydraulic1
Not stated: 1%
- Installation39
- Service & maintenance35
- Commissioning13
- Inspection5
- Statutory inspection2
- Repowering / dismantling1
Not stated: 30%
- Vestas20
- Siemens Gamesa9
- Enercon6
- GE Vernova6
- Nordex1
Not stated: 69%
- United Kingdom42
- Europe (not specified)20
- Germany18
- Poland13
- Taiwan7
- Denmark4
- Romania4
- Sweden4
- Other30
Not stated: 11%
- Offshore70
- Onshore53
Not stated: 10%
- GWO BST39
- GWO (module not stated)25
- Offshore medical20
- Chester Step test17
- GWO BTT10
- Medical (unspecified)10
- GWO Enhanced First Aid8
- GWO Slinger Signaller8
- HV / electrical authorisation7
- Vestas training7
Not stated: 30%
136 job ads in this period · at least 121 positions in the 22 ads that state a number · urgent: 26%
- Mechanical47
- Electrical (LV)40
- Supervision / site lead35
- High voltage (HV)27
- HSE12
- Other11
- Lifting / rigging10
- Blade3
- Hydraulic1
Not stated: 1%
- Installation39
- Service & maintenance35
- Commissioning13
- Inspection5
- Statutory inspection2
- Repowering / dismantling1
Not stated: 30%
- Vestas20
- Siemens Gamesa9
- Enercon6
- GE Vernova6
- Nordex1
Not stated: 69%
- United Kingdom42
- Europe (not specified)20
- Germany18
- Poland13
- Taiwan7
- Denmark4
- Romania4
- Sweden4
- Other30
Not stated: 11%
- Offshore70
- Onshore53
Not stated: 10%
- GWO BST39
- GWO (module not stated)25
- Offshore medical20
- Chester Step test17
- GWO BTT10
- Medical (unspecified)10
- GWO Enhanced First Aid8
- GWO Slinger Signaller8
- HV / electrical authorisation7
- Vestas training7
Not stated: 30%
Based on 136 job ads tracked on windspellers.com since 16 Oct 2026. Not the whole market. One ad = 1, whatever the number of positions. Company names are never counted.
How we count. Every wind job ad published on the windspellers.com job board is counted once, whatever the number of positions. Ads stay in the history after they close, so months can be compared. Each ad is sorted by discipline, work type, turbine maker, country, onshore/offshore and seniority from what the ad itself says; when an ad doesn't say, it is counted as "Not stated" and shown as such. Company names and contact details are never counted.
Source: windspellers.com Workforce Radar, counted on 27 Oct 2026 — https://windspellers.com/radar.html
// HALF 2 Coming next — from the news
| ROLE | Q4 2026 | Q1 2027 | Q2 2027 | Q3 2027 |
|---|---|---|---|---|
| Mechanical | MED | MED | LOW | LOW |
| Electrical (LV) | MED | MED | LOW | LOW |
| High voltage (HV) | MED | LOW | LOW | LOW |
| Lifting / rigging | LOW | LOW | LOW | LOW |
| HSE | LOW | LOW | LOW | LOW |
| Supervision / site lead | MED | LOW | LOW | LOW |
| Installation technicians | MED | MED | LOW | LOW |
| Service technicians | MED | MED | LOW | LOW |
We only started tracking job ads on 16 October, so this outlook rests on very little data and we rate nothing High.
The projects in this month's news (floating pilots, large UK offshore farms, a new market) are early and not expected to hire before about 2028, and most crews will move across from other projects.
For now, keep GWO BST, Slinger Signaller, offshore medical and HV authorisation valid, and apply to the current ads for installation, commissioning and service work, mainly in the UK, Germany and Taiwan.
Estimates by a working wind technician, with the help of AI, based on 5 news items this month. Read the news →
Permanent link to this month's outlook: windspellers.com/radar-2026-10.html · Source: windspellers.com Workforce Radar, October 2026